Communication

Press releases

The port loads wind generator blades for France

22-02-2016

The blades have been loaded aboard the vessel Medazov Julia docked at the Muelle del Centenario

The Port of Castellón has seen the loading of wind generator blades bound for  Sete in France. The operation took place on the Muelle de Centenario inside the port aboard the vessel Medazov Julia, with a length of 110 metres and a net weight of 4.099 tons.

 

 

Quiero recibir las notas de prensa